top of page

SR 2017 Realignment - Near the Oblates of St. Joseph

Laflin Borough, PA

Scope of Work:

The project will consist of the realignment of SR 2017 to allow a better truck turning radius and installing dedicated turning lanes with a new traffic signal to improve traffic congestion. Other work included with the project are drainage improvements, utility relocation, guiderail, pavement resurfacing, excavation, full depth bituminous paving, temporary concrete barrier, concrete curbing, concrete shoulder with rumble strips, temporary traffic control, pavement markings, signing, permanent concrete barrier, E & S Control measures and other miscellaneous construction work, all contained within an overall project length of 592.62 linear feet.

bottom of page